1
/
of
1
Floating LNG Installations 1ST Edition
Floating LNG Installations 1ST Edition
SKU:P31457
Regular price
$800.00 AUD
Sale price
$800.00 AUD
Regular price
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Expected delivery date:
21 Jun
Usually ready in 2-3 days.
Couldn't load pickup availability

Specifications
Description
This document covers two critical areas when considering floating LNG installations:
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to
consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.
SKU: P31457
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to
consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.
SKU: P31457
Floating LNG Installations 1ST Edition
Regular price
$800.00 AUD
Sale price
$800.00 AUD
Regular price
Unit price
/
per
Floating LNG Installations 1ST Edition
Regular price
$800.00 AUD
Sale price
$800.00 AUD
Regular price
Unit price
/
per
Product description
This document covers two critical areas when considering floating LNG installations:
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to
consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.
SKU: P31457
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to
consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.
SKU: P31457
Material
N/A
Year
N/A
Features
N/A
Dimensions
N/A